Applications
Control renewal, capacity increase and local spare-part supply for installed LOI, EBNER and similar all-hydrogen bell-furnace lines.
Bell Furnace Modernization and Spare Parts
For installed imported all-hydrogen bell furnaces such as LOI (Germany) and EBNER (Austria), Hengyuan supplies control-system upgrades, its own control software, heating hoods and other key spares, and additional bases. Hengyuan equipment is interchangeable with the original units, extending service life and raising output while keeping existing processes and operating practice.

The upgrade scope is defined after a site survey.
Many bell-furnace lines imported years ago now run on obsolete controls, with long lead times and high prices for spares. Hengyuan knows the design and process logic of LOI, EBNER and other leading bell furnaces and can upgrade them without changing the base foundations or operating practice.
Improved combustion and heat-transfer design lets upgraded heating hoods shorten the heating cycle noticeably and raise the output of the whole line.
Control renewal, capacity increase and local spare-part supply for installed LOI, EBNER and similar all-hydrogen bell-furnace lines.
Site survey, PLC and HMI upgrade, control software, heating/cooling hoods and inner covers as spares, complete new bell furnaces, installation, commissioning and training.
Original make and year, number of bases, existing PLC/HMI, list of spares required, capacity target.










Angang Steel Co., Ltd., Cold Rolling Mill No. 1 · 2019
Part of Anshan Iron and Steel Group
The mill operated 90 all-hydrogen bell furnaces originally supplied by LOI of Germany. In 2019 Hengyuan upgraded the controls from Siemens S5 to S7. Its newly developed Hengyuan LOI All-Hydrogen Bell Furnace Control Software V4.0 matches the existing equipment, and Hengyuan supplies heating hoods interchangeable with the LOI units.

Tianjin Decai Cold Rolled Sheet Co., Ltd. · 2021–2025
Part of Delong Steel Group
Hengyuan built 25 new bell furnaces in three phases between 2021 and 2025, fully interchangeable with the plant's existing LOI bell furnaces. Improved Hengyuan heating hoods cut the heating cycle from about 22 hours to about 17 hours, roughly 22% more heating capacity.
For performance data, configuration proposals or reference-site visits, please contact the Hengyuan sales team.
Contact us