Line configuration
The project includes 15 heating hoods, 15 cooling hoods, 30 furnace bases and 18 final-cooling stations, with dual-fuel firing for natural gas and coke-oven gas.
A pure-hydrogen protective atmosphere and strong convection support heat transfer and coil-temperature consistency, while the automation system manages recipes, records and safety interlocks.
Integrated delivery
The furnace, combustion, atmosphere, cooling, automation and auxiliary packages were engineered as one production system for industrial-scale operation.




